deonnatemple
deonnatemple deonnatemple
  • 19-03-2018
  • Mathematics
contestada

13.   There are 45 employees who each put in 97 hours on a project. What are the total number of hours worked on the project?

Respuesta :

mushy12mc
mushy12mc mushy12mc
  • 19-03-2018
you would do 45 x 97 which equals 4365
Answer Link

Otras preguntas

According to Langdon, what is the "Death Ritual" in the book The Lost Symbol.​
The figure is a trapezoid. Find the value of the variables. a) x = 85, y = 75 b) x = 75, y = 85 c) x =95, y = 105 d) x = 105, y = 95
the base of this right prism is a regular nonagon (9 sides) each side = 10 ft. the height of the prism = 15 ft. solve for surface area and volume.
what species produced when an acid donates a hydrogen ion to form a base.
Civil engineering projects include a huge variety of old and new structures; including, bridges, shopping malls, power plants, sewage systems, and skyscrapers.
Reviewing Nouns & Their Uses Exercise A (1) Underline each verb twice and each subject once. (2) Above each noun write its use: s. (subject), d.o. (direct o
Two cars pass one another going in opposite directions along a long straight road. the westbound car is going 60 miles per hour and the eastbound car is going 6
If a DTC has not been set, then the vehicle is running perfectly
Please help me please 15 points Explain why the equation below and the graph DO NOT MATCH In photo below
At what distance does the typical runner achieve maximum velocity? 15 to 20 meters 20 to 30 meters 25 miles per hour 12 meters