What conditions must exist for separate contracts to be viable?

Respuesta :

W0lf93
W0lf93 W0lf93
  • 30-01-2018
The owner must be an in house CM or construction engineer to administer the contracts. CM is established as an independent contractor. The CM is responsible to the owner to complete the project by the established substantial completion date and within the agreed budget. The CM must compensate the owner when the construction does not satisfy the established standards of performance for a project.
Answer Link

Otras preguntas

How do I graph this??
George was 19 years old when he was diagnosed with schizophrenia. he was a freshman at college majoring in pre-med at the time, but at 25, he now lives with his
For this assignment, you will write an essay describing the production of protein molecules through transcription and translation. Your essay should include dis
Solve for X. 0.8x + 88.2= 300
How often should you update a caller who is on hold?
Who challenged traditional Confucian morality in his poetry?
What caused me jones and his friends to attack animal farm
If the Bantu established their homeland in 2000 BC approximately how many years ago did this event happen? a)4,017 years ago b)2,017 years ago c)17 years ago
(x+14)-(8-2x) equivalent to
When chris missed his connecting flight due to bad weather, he became extremely upset and worried about the important meeting he was going to miss. in this scen