A network diagramming technique in which boxes represent activities is known as a(n) _____.

a. pdm

b. cpm

c. adm

d. pert

Respuesta :

StrongBad
StrongBad StrongBad
  • 16-11-2017
PERT is a review technique/tool, so that can't be it. CPM is Critical Path Method, and you can use a PDM or an ADM to chart it. 

The easy way to remember this answer, is that you write on the arrow when using the "arrow diagram method."  

So the answer is "a. pdm" (precedence diagram method).
Answer Link

Otras preguntas

Anyone know how to do this with a explanation ?
what is 2+5 nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn
what is the length of AC ?
What position do the sun and moon have to be in to create a spring tide?
8^(2x+3)+8^(2×+1)-8^2×=519*2^2010 x=?
The number which is repeated as a factor in an exponential expression exponent 2. the fixed amount multiplied by a term to get to the next term in a geometric s
When a muscle is constantly used it becomes
visible part if ear is : - basilar membrane - ear drum / tympanum - external ear/ pinna
Triangle XYZ with vertices X(0, 0), Y(0, –2), and Z(–2, –2) is rotated to create the image triangle X'(0, 0), Y'(2, 0), and Z'(2, –2). Which rules could describ
need helpppppppppp pleaseeeeeeeeeeeeeeeeeeeeeeeeeee