brysonsandridge988 brysonsandridge988
  • 20-08-2017
  • Business
contestada

A summary of expected costs for a range of activity levels that is geared to changes in the level of productive output is the definition of a

Respuesta :

sunset455
sunset455 sunset455
  • 20-08-2017
A flexible budget is your answer
Answer Link

Otras preguntas

⊕PLEASE ANSWER CORRECTLY⊕ Which types of electromagnetic waves have higher frequencies than the waves that make up ultraviolet light? Check al
A 12.0 cm object is 18.0 cm from a concave mirror that has a focal length of 9.0 cm. Its image is 8.0 cm in front of the mirror. What is the approximate height
Which government agency primarily deals with domestic policy issues?
what shape is a kite? Could you prove it? How?
How do you know if a substance is polar or no polar
Republicans reminded voters that they had kept the Union together during the Civil War because? A. that was the last time they elected a president. B. Reconstru
What was Christian Wirth’s original assignment prior to his transfer to Poland?
which best describes when a sonic boom occurs? A. when a object travels at or above the speed of sound B. when an object travels at the speed of sound C.When an
Which phenomenon can explain the presence of volcanoes in the middle of the pacific ocean?
Only the Virginia Declaration of Rights and the Bill of Rights granted freedom of speech, the press, and religion. True or False?