xallymillerx9137 xallymillerx9137
  • 19-09-2022
  • Mathematics
contestada

A painting service charges $65 for a project in addition to $11 per hour. if they charge you a total of $263, how many hours did it take to complete the project?

Respuesta :

Gabby1123
Gabby1123 Gabby1123
  • 19-09-2022

Answer:

18 hours.

Step-by-step explanation:

Subtract $65 from the total.

263 - 65 = 198

Divide by 11.

198 ÷ 11 = 18

Answer Link
KellinSucks
KellinSucks KellinSucks
  • 19-09-2022

Answer:

18 hours

Step-by-step explanation:

$263-$65=$198

$198÷$11=18 hours

Answer Link

Otras preguntas

A zookeeper perdiceted that the wight of a newborn lion would be 2.8 pounds when the zoo’s lion gave birth ,the newbor. Weight 3.5 pounds what is the zookeeper’
1. To determine the height of a tree, a botanist makes the following diagram. What is the height of the tree? 70° 20 ft
Why do you think human rights have been so difficult to enforce?
aluminuim is many factured by the electrolysis of molten aluminium oxide what are the gasses formed
Combine these radicals. -√5-3√5
She loved him nonetheless. He brought her treasures from his traps. He told her stories of strange creatures he'd seen in the salt marshes. Which of the followi
Helpppppp please!!! How do membrane proteins contribute to the membrane potential?
How many seconds in day?
Suppose a commercial bank has checkable deposits of $60,000 and the legal reserve ratio is 25 percent. If the bank's required and excess reserves are equal, the
6. If the zeros of a quadratic funtion, f(x), are -2 and 6, what is the equation of the axis of symmetry of f(x)? ints a. X= -2 b. X= 2 c. X= 4 d. Cannot be det