easymoney80 easymoney80
  • 16-08-2022
  • Mathematics
contestada

Find the work done in moving an object along a vector
R = 3i + 2j - 5k if the applied force is
F = 2i-j-k.

Respuesta :

pragatitelmore02 pragatitelmore02
  • 16-08-2022

Answer:

Step-by-step explanation:

Given : r = 3i+2j-5k

            f = 2i-j-k

To find : Work done (w)

Formula : w= F.r

Solution :

According to the given formula,

w = F. r

w = (2i -j-k). (3i+2j-5k)

w = [(2*3) - (1*2) + (-1)(-5)]

w = 6-2+5 = 9J

Therefore work done in moving a object is 9J.

Answer Link

Otras preguntas

Factor. 15x-9 how do i solve and get the correct answer
Bob works at a café, where he earns $11 an hour. Which of the following graphs describes the amount of money that Bob earns after x hours? Question 15 options:
The continuous random variable N has a normal distribution with mean 7.5 and standard deviation 2.5. For which of the following is the probability equal to 0 ?P
Underline the adjectives in the sentences below 17. The thirsty boy drank the water ​
Erin was not feeling well. She knows a normal temperature is 98.6°F. Her temperature is 98.6°F.Write an equation that compares her temperature. and normal tem
which fraction is closest to 1 a) 8/7 b) 9/11 b) 6/5 c) 1 whole 2/9
Find the circumference of the circle
Create a function rule for the situation below.
Did you answer question 2 ?
What is an Conclusion paragraph about Coronavirus?