lukeagnew0908 lukeagnew0908
  • 20-05-2022
  • Mathematics
contestada

If 15 workers can finish a job in 8 days. How many more workers would it take to finish in 6 days?

Respuesta :

msjaelah809
msjaelah809 msjaelah809
  • 20-05-2022

Answer:

720

Step-by-step explanation:

6x8=48 but you still have that 15 so 15x48=720

Answer Link
samnathanaelthilag samnathanaelthilag
  • 20-05-2022

Answer:

15 workers => 8 days
n workers => 6 days
15 * 8/6 = 20 = n
therefore 5 more workers are required

Step-by-step explanation:

Answer Link

Otras preguntas

How many C’s of Credit are there? A. 8 B. 6 C. 5 D. 7
Hdsbsdbsbdbdbdbdbddbdbdndndn
Given a standard six-sided die, what is 1 point the probability of rolling a 2? Please use a fraction bar (/) OR a colon (:) to represent your answer.
determine the equation of the circle graphed below
Ano ang ibig sabihin ng subsidiary moral right o pantulong na karapatang moral? Ipaliwanag
Complete the point-slope equation of the line through (-5,7) and (-4,0) y-7=?
3/17=y/7 round to the nearest tenth
Which data set could be represented by the box plot shown below 1,3,6,8,10,12,13,16,18,20
SECTION:B NUMBER PATTERNSjohnny's tile shop has a newly disigned tile. It can be odered in different sizes. size 1 has one white tile in the middle and is surro
A rock is thrown from the edge of the top of a 51 m tall building at some unknown angle above the horizontal. The rock strikes the ground a horizontal distance