gabbysanchez4132 gabbysanchez4132
  • 18-03-2022
  • Social Studies
contestada

When would the keystone pipeline have been completed.

Respuesta :

Creativefreak6
Creativefreak6 Creativefreak6
  • 18-03-2022

Answer:

can you post context with this question

Answer Link
Аноним Аноним
  • 18-03-2022

Answer:

wouldn't be completed yet," he said. "It wouldn't be online and wouldn't be pumping oil until the year 2023

Hope it helps!!!!!!!brainliest pls!!!!!!!!

Answer Link

Otras preguntas

The momentum of a bald eagle in flight is calculated to be 345. The mass of the eagle is 5.0 kg. What is the magnitude of the velocity of the eagle?
How has terrorism changed in recent years?
Mr. Taylor raised all his students’ scores on a recent test by five points. How were the mean and the range of the scores affected? (1) The mean increase
Which ratios are proportional to 40 : 50
What attracted settlers to the Middle Colonies?
Why did Britain consider India its “jewel in the crown”?
Why was the Congress of Vienna considered a success?
in which citation is formatted correctly in MLA style?
Which of the following words is most likely to carry a connotation? a. Run b. Stride c. Walk d. Stand
What are two theories about migration to the Americas?