morgancyrus
morgancyrus morgancyrus
  • 20-11-2021
  • Mathematics
contestada

PLS HELP
A certain job takes 2 people 50 hours to complete. How many people are needed to complete the job in 25 hours?

Respuesta :

crimsonkid521
crimsonkid521 crimsonkid521
  • 20-11-2021
Simple answer 1 because 50 divided by 25 is 2 so it takes one person because two people do it on 50 hours
Answer Link
diana061 diana061
  • 20-11-2021
Answer: 1 person. Each person takes 25 hours each for both people complete the 50 hour job, so for one person it’ll be 25 hours.
Answer Link

Otras preguntas

Also called Pilgrims
A number between 10.2 and 10.3 is
PLEASE HELP FAST! :) I like my cousins, but when we go to the mall together, they drive me crazy. Debra stops and looks at herself in every mirror to comb her h
Factor as far as possible 3u^4-4u^3 and 3u^7+12u^2
320 square foot room. Width is 4/5 length. What is width and length?
The civil war is also called "war between states" why?
Chitra spent $200 at a thrift shop. She bought 3 rings for $21 each and spent the rest on 4 equally price bracelets. How much did each bracelet cost?
how did the New Deal programs differ from president Hoover's attempt tom combat the depression?
a water wheel makes 28 revolutions in 90 seconds. how many revolutions can it make in 4 minutes?
Jay King, owner of a local Bed and Bath Store knows that his customers will only pay at most, $299 for a blow up bed. Assuming Jay wants a 40% markup on selling