Your boss wants to know how long your project is going to take. Which part of the plan should you share with your boss?

Respuesta :

ains89
ains89 ains89
  • 19-11-2021

Answer:

the estimated amount of time it takes to get the project done

Answer Link

Otras preguntas

best definition of federalism?
_________________ allowed people to settle in one area, instead of being nomadic.
• a warrior culture from Scandinavia • raided Britain and Europe in the 9th and 10th centuries • used large, maneuverable ships called longboats Which group of
define the role that oxygen plays in the electron transport chain
SELECT ALL THAT APPLY. Four causes of the Great Depression included: *a weak national economy *agricultural overproduction *an imbalance of foreign trade *stock
what is 10 percent of 2 kilograms
The Boston Massacre was an unplanned attack on the colonists by the British soldiers. A.True B.False
91 boxes of apples hold a total of 2,605. Assuming each box has about the same number of apples, estimate of apples in each box.
Hitler was confident about invading Russia because he had recently captured Spain. France. Great Britain. Switzerland.
Which ordered pairs in the form (x, y) are solutions to the equation (x + 3)y = 14? Choose all answers that are correct. A. (−5, −7) B. (−1, 7) C. (10, −2)