kpandey1973
kpandey1973 kpandey1973
  • 18-08-2021
  • Social Studies
contestada

what should be done to complete development project in time? write eight points​

Respuesta :

yushan
yushan yushan
  • 18-08-2021

Answer:

the things that should be done to complete development projects in time are:

Explanation:

1) authority should be taken more faster

2)skilled manpower should be developed

3)people should be focused on the project

4)people should have unity among them

Answer Link

Otras preguntas

i need help!!! y=6x y=42 simplify the answer as much as possible
need answer as soon as possible
A teacher student committee consisting of 4 people is to be formed from 5 teachers and 20 students. Find the probability that the committee will consist of at l
ASAP HELP BRAINLIEST for anyone who awnsers correctly.In the Declaration, Jefferson lists 27 specific examples of why the Americanswere justified in overthrowin
PLEASE HELLPPPwhat is : -4(3-5)+10-3(7+4)+30​
If you compare the red triangle to the blue triangle are the figures similar, congruent, neither, or it is impossible to tell?
The combustion of 0.25 mol of an unknown organic compound results in the release of 320 kJ of energy. Which of the compounds in the table could be the unknown c
A vector points -1.55 units along the x-axis, and 3.22 units along the y-axis. Find the direction of the vector.
Create a list of steps, in order, that will solve the following equation. 3(x+2)^2=48
Calcium oxide is produced in a combination reaction. How many grams of oxygen is required to react with 23.455 grams of calcium?