princessuwadiae2007 princessuwadiae2007
  • 19-07-2021
  • Mathematics
contestada

10 boys cleared a piece of land for 21 days how many days will it take 7 boys to clear the same land if they work at the same rate
​

Respuesta :

danielmaustin51
danielmaustin51 danielmaustin51
  • 25-07-2021

Answer:

it took 7 boys 21 days to clear a piece of land.

Answer Link

Otras preguntas

Lithium chloride has a solubility of 55 g of LiCl in 100. g of H₂ O at 25 °C. Determine if each of the following mixtures forms an unsaturated or saturated solu
Suppose that the height (in centimeters) of a candle is a linear function of the amount of time (in hours) it has been burning. after 7 hours of burning, a cand
what are the checks available to the legislative branch?​
Mrs Neo has two packets of flour. The ratio of the mass of flour in Packet A to the mass of flour in Packet B is 1: 2. Mrs Neo uses of the flour in Packet A and
the states whose representatives proposed the Virginia Plan, the New Jersey Plan, and the Great Compromise
Your friend says that the absolute value equation |3x+8|-9=-5 has no solution because the constant on the right side of the equation is negative. Is your friend
Directions: Write the following sentences correctly in Perfekt by writing in the correct form of haben or sein. The verb is provided for you in parentheses afte
1. 3y=-3x+6 Slope_ y-intercept
Academic Debate: Nazi Germany Option 2: Essay (Minimum Requirements) 5 Paragraphs & bibliography - - - - Introduction (includes thesis statement) Define you
work out the circumference of the circle below, Give your answer to 1 d.p 7.6m​