Si 27 hombres terminan una obra en 16 días, ¿cuántos hombres se necesitarán para terminar la obra en 24 días?

Respuesta :

1028605
1028605 1028605
  • 16-03-2021

Answer:

hi

Step-by-step explanation:

Answer Link
Whalewarrior Whalewarrior
  • 16-03-2021

Answer:

18 hombres

Step-by-step explanation:

usaremos una ecuación para resolver

x/27 = 16

x= 27* 16

x=432

432/ h = 24

432/24 = h

h = 18

perdóname por mi mal español. No es mi primer idioma.

Que tenga un buen dia :)

Answer Link

Otras preguntas

What is realpolitik?
George Bernard Shaw criticized the importance of being earnest fora) being too longb) not being funnyc) not having any real substance
Express fx and fy in terms of the length of the vector f and the angle θ in paired form
the population of ages at inauguration of all us presidents who had professions in the military is 62,46, 68,64,57. why does it not make sense to construct a hi
What is realpolitik?
Which mountain do scientists label as our most dangerous volcano ?
In photosynthesis, water undergoes ______ while carbon dioxide undergoes ________a. oxidation .... reductionb. reduction .... oxidationc. no change ....
What is realpolitik?
if 10 800 cm2 of material is available to make a box with a square base and an open top find the largest possible volume of the box.
the population of ages at inauguration of all us presidents who had professions in the military is 62,46, 68,64,57. why does it not make sense to construct a hi