faderogaorico36 faderogaorico36
  • 21-02-2021
  • Mathematics
contestada

8. Four Men working together can finish a house repair job in 12 days.
How many days will 6 men working at the same rate finish the same ja
9 Which of the​

Respuesta :

asmaNasr
asmaNasr asmaNasr
  • 21-02-2021

Step-by-step explanation:

if 4 men did the job in 12 days , then each of the 4 men worked for 12 days , which means they worked for 4*12=48 days , so the job takes 48 work days to complete. If all men work at the same rate, then these other 6 will complete the job in

[tex] \frac{48}{6} = 8 \frac{days}{man} [/tex]

Therefore, it’ll take the group of 6 men 8 days to complete the job.

Answer Link

Otras preguntas

which instrument has an enclosed reed and produces a buzzing sound
The perimeter of the triangle is 6.9 meters. What is the unknown side length?
What inference can be made about montague from this dialog He is very concerned about Romeo He is annoyed whit romeos bad mood He is unaware that Romeo is h
Which of the following best describes a subject of Rome? A. A person who is protected by the law of Rome B. A citizen of Rome C. A free person who owns land D.
How is each family member related to Ana?
Which equation describes a line that has a slope of 4/5 and a y- intercept of 2/5
Who was the first Haitian to initiate colonial reform?
EXTRA CREDIT: Write an equation that is parallel to 3x – 2y = 14 and passes through the point(-6.-11) in slope intercept-form. Your answer​
Why did Washington decide on neutrality as his foreign policy?
A trail map has a scale of 3 inches to 2 miles. On the map, a trail is 5 1/4 inches long. How long is the actual trail? A. 1 and 3/4 miles B. 2 and 5/8 mile