puppyloverneenie
puppyloverneenie puppyloverneenie
  • 17-02-2021
  • Mathematics
contestada

If a well is dug at -60 feet per day. How many days did it take to dig -5400 feet?

(Answer numerically ex: 30 Days answer = 30)

Respuesta :

wyattascott2004 wyattascott2004
  • 17-02-2021

Answer:

90 days

Step-by-step explanation:

This one is just simple division, so you divide the goal number which is -5400 by -60 but in this situation you can just make them positives.

Answer Link

Otras preguntas

Pepino’s pizza charges $8 for medium pizza plus $2 for each topping. How many toppings are on a medium pizza that costs $20?
Help? Total surface area
how can schools address discrimination​
Diana is working on a painting for school. She needs 1 1/5 ounces of yellow paint and 2 1/2 ounces of orange paint. How much less yellow paint does she need tha
A piece of music in the key of B flat major is based on the____ scale. ( i didnt see a music in "pick a subject" but I am talking about music not art)
This is due in 10 minutes please help me
The table shows the cost of hiring a concrete mixer for up to 5 days.12Number of days3451945Cost in £3258 71The cost of hiring the concrete mixer is made upof a
Just wanna meet some frds so feel free to leave ur contact here :)​
¿Cómo se dice "Answer the question" en español?
Mario Works in a bakery he made 90 more loaves of bread on Saturdays and he did on Sunday he made 70 loaves of bread on Monday than he did on Sunday if he mad