Mike needs to write the primary objectives of a project in a project plan. In which section should he write them?
A.
scope
B.
overview
C.
baselines
D.
schedule

The answer is B.) overview

Respuesta :

daraya
daraya daraya
  • 21-01-2021
D because you are always supposed to use your schedule
Answer Link

Otras preguntas

Factor each number until all the factors are prime 30, 27, 48, 500
In the Odyssey, which character demonstrates tremendous devotion to Odysseus? A. Circe B. Aeolus C. Penelope D. Poseidon
The 1978 Supreme Court decision in Bakke v. Regents of the University of California A. established the "red state-blue state" divide. B. established the rights
A trailing or climbing plant is also known as a _____?
~please only answer if you know for sure~ -Thank you-
how to factor by grouping
The process of pasteurization is named after which famous French microbiologist?
How old is bob from the outsiders
Stretching from Missouri to New Mexico, the _______ was the primary trade route in the Southwest throughout most of the 1800s until the coming of the railroad i
Quadratic Transformations C11T7 1. Write the vertex form of a quadratic equation. 2. Name the 3 ways that a parabola changes with different t