amyjarvis220586 amyjarvis220586
  • 21-01-2021
  • Mathematics
contestada

If 4 workers take 900 hours to finish a project, how long will it take 8 workers to
complete the same project?

Respuesta :

Kennedyboyd06 Kennedyboyd06
  • 21-01-2021

Answer:  450hrs

Step-by-step explanation: 4workers take time 900hrs

Therefore 1 worker complete in = 900/4

→ 3600hrs

then 8 workerz take time = 3600/8 = 450hrs

SO, ANSWER IS → 450hrs

Answer Link

Otras preguntas

Which system of equations has the same solution as the system below? 2x + 2y = 16 3x - y = 4 (1) 2x +
 The Hellenistic culture brought together Egyptian, Greek, Persian, and Indian influences. Write a brief essay showing how American culture is a combination of
wHAT TENSE ALLOWS FOR AN EVENT THAT BEGAN IN THE PAST TO CARRY INTO THE PRESENT MOMENT IN TIME
Biomes on Earth have exhibited changes throughout history that have been caused by a variety of factors. Over the past 50 years, the amount of tropical rainfore
A cheetah ran 704 feet in 8 seconds, and then another 328 feet in 4 seconds. What was the cheetah's average speed?
What is the exact volume of a sphere with a diameter of 36 in.?
In the wake of the Bay of Pigs invasion, tensions
What is another term for the responding variable? A. Primary variable B. dependent variable C.independent variable D.uncontrolled variable
Why would Congress not ratify the SALT II treaty? A. Russia reneged on its part of the treaty. B. The Iranian Revolution stopped the treaty. C. Russian combat t
Why was terror an important weapon for Genghis Khan?