amyjarvis220586 amyjarvis220586
  • 21-01-2021
  • Mathematics
contestada


If 4 workers take 900 hours to finish a project, how long will it take 8 workers to
complete the same project?
350
hours

Respuesta :

khawaslegend
khawaslegend khawaslegend
  • 21-01-2021

Answer:

It will take 1800 hours to complete same project.

Answer Link
staciajoy
staciajoy staciajoy
  • 21-01-2021
1800 hours to complete
Answer Link

Otras preguntas

Use the terms from this unit as effectively as you can. Be sure to answer all of the questions, above, that are bold. Harlem-What Happens to a Dream Deferred? W
The Spartan government consisted of all of the following except a. council of elders c. ephors b. cabinet of generals d. an assembly
What Is the Beringian Theory?
6) What is the length of the diagonal of the rectangle? A) 2.5 units B) 4.5 units C) 5 units D) 7 units
what is an organic molecule that consists of C, H, O atoms in a ratio of 1:2:1
The instructions for a model airplane show a scale of 1 in: 36 ft. What is the length of the drawing if the actual length of an airplane is 144 ft?
Question 5 of 10 What does a claim of policy argue? A. Whether something is an accepted fact or not B. Whether or not a specific action should take place OC. Wh
32 divided by 4x [16x1/2]-2
can anyone compare and say a connection between the painting of the starry night and the olive trees​
Select the correct answer. Consider the given functions. A table with values of x and f of x is given along with a non-linear equation g of x equals 2 power x m