adegbitecharles46
adegbitecharles46 adegbitecharles46
  • 19-01-2021
  • Mathematics
contestada

3 men painting a house take 7's
days. How long would 5 men take
over the same job, working at the
same rate?​

Respuesta :

Аноним Аноним
  • 19-01-2021

Answer:

21 days

Step-by-step explanation:

Answer Link

Otras preguntas

What is the measure of angle B
Because of polarization among Americans, the parties are more likely to nominate candidates who are: centrist. independent. ideological. moderate.
Electrical strain gauges were applied to a notched specimen to determine the stresses in the notch. The results were εx=0.0019 and εy=0.00072. Find σx and σy if
Describe the hepatic portal system?
The Reynolds number is the major parameter that relates fluid flow momentum to friction forces. How is the Reynolds number defined? How does the boundary layer
in what year was the gay rights movement?​
How does a computer know whether an arriving frame contains an IP datagram or an ARP message?
____________________deals with syntax and semantics ofinformation exchange. a. Presentation layer b. Session layer c. Application layer d. Transport layer
You can harness visionary language by using:
the product of 3 different positive integers is 8 . What is the sum of these integers ? A : 7 B : 11 C : 13 D : 14