barshadhungana502
barshadhungana502 barshadhungana502
  • 19-01-2021
  • Mathematics
contestada


If 2 men and 3 boys can do a piece of work in 8 days, how long will 3 men and 4 boys take to do it?​

Respuesta :

LAASMITH7
LAASMITH7 LAASMITH7
  • 19-01-2021

Answer:

they would do it in 13 days

Answer Link

Otras preguntas

To model ocean water in different places on Earth, a student pours equal amounts of water in two containers. He adds the same amount of salt to each container a
advertisement for a newly opened fruit shop.​
A boy weighs 84 lbs, what is his mass? a. 185 kg b. 84 lbs c. 84 kg d. 38 kg please help asap! giving 20 points
WILL GIVE BRAINLIEST!! What similarities and differences do you see between the Great Depression and the economic “depression” of recent years? Have we been exp
On December 31, 2016, Beckford Company issues 150,000 stock-appreciation rights to its officers entitling them to receive cash for the difference between the ma
solve the equation 3x+2=x=4(x+2)
Find the volume for each.​
PLS HELP 45° . 9 V Solve for x. 09 O 9V2 O 9V3 09 IN
A truck is painting Traffic lines along a highway the truck paints 8 miles of lines in 3 hours at the rate how many miles can a truck paint in 12 hours.
A jewelry prism with a length of 9 inches and a height of 4 1/4 inches. The volume of the jewelry box is 283 1/2 cubic inches. What is the width of the box?