sandalimendes8 sandalimendes8
  • 16-12-2020
  • Mathematics
contestada

Four men take 6 days to complete a certain work. Find the number of men needed to complete the same work in 8 days

Respuesta :

scootermaster34
scootermaster34 scootermaster34
  • 16-12-2020

Answer:

the answer is 5 men i think

Answer Link
morenos2024
morenos2024 morenos2024
  • 16-12-2020
The guy above me is right
Answer Link

Otras preguntas

The sum of three times a number and seven is 22
filtering air to remove dust and pollen is it chemical or physical change
a fish taco from Ama taco truck cost $4.50. a soda cost $1.25. if corey eats a fish taco and soda and wants to tip 15% how much will he need to tip
Judaism, Islam, and Christianity share a belief in
58:31 Read the body paragraph from an analysis of "Two Kinds What would make the evidence in this paragraph stronger? Select two options, A be another quotation
how do you respond to como eres tu?
Scientists can use rock layers to determine which of the following? (3 points) a. The mass of Earth b. The size of Earth c. The age of Earth d. The amount of la
Solve the system by elimination: -2x + 2y + 3z = 0 -2x - y + z = -3 2x+ 3y + 3z = 5
Hinila ko ang baging, sumigaw ang matsing:​
ILL MARK YOU AS BRAINLESS PLS HELP ME