15 men can dig a ditch in 10 days, how many day
Will 10men take working at the same rate​

Respuesta :

anitaupadhyaybmc
anitaupadhyaybmc anitaupadhyaybmc
  • 18-10-2020

Answer:

If 10 men dig a ditch in 12 days .

Total man-days required to dig the ditch

= 10 men × 12 days

= 120 man-days

how long would 15 men take to dig it?

No of days required to finish the job by 15 men

= 120 men-days / 15 men

= 8 days

Answer: 8 days will be required to finish the job by 15 men

Step-by-step explanation:

Hope this helps u

Crown me as brainliest:)

Answer Link

Otras preguntas

Question 1 of 15 went on the air in the 1920s and The radio show called. became the most important radio show in the history of country music. A. Modern Sounds
How is a recessive allele different from a dominant allele
select the correct answer what logarithm function has a y-intercept
travis purchased a car for 25,000.​
What is the definition of a vector
Help pleaseeeeeeeeee
Question 5 of 20 What is one of the most important aspects that newspapers must take into account when printing an article? O A. Whether there are enough quotes
A group that consists of one or more adults and the children that they are raising is known as a:
A car accelerates from rest to 50 m/s in 5 seconds. What is the car’s acceleration?
A compound microscope consist of an objective lens of focal length of 0.5cm and an eyepiece of focal length 1cm. The two lenses are separated by distance 14cm.