melissaw40 melissaw40
  • 18-09-2016
  • English
contestada

what is the subject and verb the project manager looked at the blueprints before visiting the job site

Respuesta :

galoctopus
galoctopus galoctopus
  • 18-09-2016
subject: project manager
verb: looked
Answer Link

Otras preguntas

Kaylee opened an account with a deposit of $800. The bank pays 4% annual simple interest on this account. Kaylee makes no additional deposits or withdrawals. Ho
What was one of consequences of farming during the dust bowl
Who could vote in the Athenian democracy? Who could not vote in this democracy?
In which of the following countries do a majority of the people practice Christianity? A. Indonesia B. India C. Thailand D. the Philippines Please select the be
can someone please help me ASAP?? I'm giving away 20 points and I'll even give you brainliest!!
the phenotype frequency in a population changes after each generation . which would most likely cause this?
Cellular respiration included the metabolic pathways of glycolysis, the Krebs cycle, and the electron transport chain, as represented in the figures. In cellula
Do you believe Mr. Sawicki’s characterization of Steve? Give evidence from the passage to support your answer.
Circle Pis represented by the equation (x-11)2+y2+10y=25. What is the radius of this circle? a. 5 b. 10 c. 25 d. 50
which of the following communication styles do women NOT use as much as men? Use we statements Saying I agree ask questions provide an abundance of information