harbilama
harbilama harbilama
  • 21-03-2020
  • Computers and Technology
contestada

Why process scheduling is needed in a uni-processor system?

Respuesta :

zunishi5688
zunishi5688 zunishi5688
  • 28-03-2020

Answer:

Process scheduling is needed in a uni-processor system to provide a balanced mix of jobs.

Explanation:

It selects processes from the queue and loads them into memory for execution. Process loads into the memory for CPU scheduling. The primary objective of the job scheduler is to provide a balanced mix of jobs, such as I/O bound and processor bound.

Answer Link

Otras preguntas

Which change will double the lateral surface area of a regular triangular pyramid with base length b , height h , and slant height l ?
identify the shape please help
Some studies indicate the best approach for transformational change may have the chief executive officer create an atmosphere for change a. let others decide h
How do I graph a solution set for the inequality 300+5x>550?
What's a way to minimize technical problems with your computer
Select all that apply. Four Allied strategies on the European front in World War II included: driving the Axis powers from North Africa the Battle of Norman
The __ has/have the power to declare the actions of the legislative and executives branch unconstitutional
An independent frame that holds a program, document, or folder contents in windows 7 is called a ____.
Which topic is best suited for a persuasive speech
A construction worker has 15 feet of pipe. He needs to divide the pipe into 9 equal sections. Which location on a number line represents the number of feet in