4) How much concrete was required to make the Hoover
Dam? Where did this concrete come from?

Respuesta :

Аноним Аноним
  • 02-11-2020

Answer:

Three and one-quarter million cubic yards.The initial concrete required for the dam was mixed in a river-level mixing plant which was located approximately 3/4 of a mile upriver from the dam site This plant provided the concrete for the linings in the diversion tunnels and for the lower levels of the dam. It went into operation on March 3, 1932.

Explanation:

Answer Link

Otras preguntas

Links will be reported Please don’t answer if you’re an American What do American accents sound like to people from other countries? Do we sound "hard"? For
can someone tell me if these are functions or not..
Encuentra el valor de x 2( x-2) = 2x-4
WILL GIVE BRAINLIEST *NO LINKS*
Speciation that involves the formation of many different species from one common ancestor is called A. linear adaptation B. adaptive radiation C. gradual specia
Elena and Diego each wrote an equation to represent the diagram. Elena wrote 35+w+41=180. Diego wrote 35+w=180.which equation do you agree with? You can assume
what factor contribute to the high diversity of life at littoral zone ​
sign on the roadway at the top of a mountain indicates that for the next 4 miles the grade is 9.5° (see figure). Find the change in elevation for a car descendi
I’m not sure on this one either!!!! Ahhh it’s timed
Where is air density greater on the mountain