gurshaan96
gurshaan96 gurshaan96
  • 17-02-2020
  • Mathematics
contestada

If 7 workers take 500 hours to finish a project, how long will it take 14 workers to complete the same project​

Respuesta :

AyaanR
AyaanR AyaanR
  • 17-02-2020
250 hours because double the people = half the work
Answer Link

Otras preguntas

Based on the measures provided in the diagram, determine the measure of the angle 0 (You may assume that point A is the center of the circle and that DC is a di
what stage of respiration immediately follows the process duplicated below? A. Electron transport train B. glycolysis C. fermentation D.Krebs cycle
Vani is trying to connect a microphone to her laptop. What are the two way she can connect the microphone?
If p() = x2 - 1 and q(x) - 5(x-1), which expression is equivalent to (p - q)(x)?
Determine if the function is an even function, an odd function or neither. > = −6x² – 5x² −2 even neither odd​
What is the purpose of a warranty? A. to protect manufacturers from consumers B. to refund your money if you are dissatisfied with a purchase C. to repair or re
European exploration really took off after Marco Polo brought back Chinese goods from Asia.
Camping is an uncomfortable experience. The first night a big brown bear came into camp and stole the cooler. It’s not fun to be in the woods. No one wants to c
Which of the following are mainly cycled through the processes of photosynthesis and cellular respiration? A carbon and sulfur B carbon and oxygen C nitrogen an
Why was the document what a black man wants by Frederick douglass written