dcummings dcummings
  • 20-06-2016
  • Business
contestada

what is a project managers biggest responsibility

Respuesta :

rblxhephzibah11
rblxhephzibah11 rblxhephzibah11
  • 20-06-2016
The project manager's role in a nutshell, is the overall responsibility for the successful planning, execution, monitoring, control and closure of a project.
Answer Link
Аноним Аноним
  • 20-06-2016
hi.
a projects biggest responsibility is the way the the project turns out.
hope this helps!!!

Answer Link

Otras preguntas

A number is multiplied by 6, and that product is added to 4. The sum is equal to the product of 2 and 23. Find the number.
how many sides has a cuboid​
rhe doctor give new life to patient​
However, not everyone is convinced that genetically modified foods are beneficial. Opponents say that too little research has been done on the effects of GMOs o
Calculate the are of each figure
(4a) square 3 ÷ (b - 2) ; a = 2 and b = 4​
The length of a rectangle is 5 cm more than the width and the perimeter is at least 61cm. What are the smallest possible dimensions for the rectangle? (Hint: Pe
• 3. Using the following formula Force (N) = mass (kg) x acceleration (m/s). How is the force of a 50kg being drops at 2m/s^2 o
why can u write both addition expression and subtraction expression for the situation
My first time on horseback was embarrassing. I had never been on a horse in my life, but I was afraid to admit it. That’s probably where my trouble started. Whe