  • Computers and Technology
contestada

what would be a standard way for anyone outside an agile team( for example, delivery partner partner of the account, head of the enablement function) to get the status of the work at any point in time?
​

Respuesta :

hayleejeanburcham
hayleejeanburcham hayleejeanburcham
  • 20-12-2019

Answer:

He/She can refer the physical/digital kanboard ,which is maintained by the team

Answer Link

Otras preguntas

lily has 3 dog toys that are red. one fourth of all her dog toys are red. how many dog toys does lily have? first draw _ circles to show _ equal parts.
After a period of (blank), a person who divorces will begin to construct a new identity as a single person. A: attachment anxiety B: separation anxiety C: se
Explain the connection between your  body and supernova
What are two advantages that locomotion gives to an organism?
Starts with 10 rabbits; each pair has 2 babies per month
Explain why the chromosomes in the haploid cells that are produced by meiosis I look different than those produced by meiosis II.
Explain why the chromosomes in the haploid cells that are produced by meiosis I look different than those produced by meiosis II.
Find the missing value for each rectangular prism. 1. Volume = 6 cu in Length = 3 in Width - 2 in Height = ____ 2. Volume = 96 cu yd Length = ____ Width = 6 yd
After a period of (blank), a person who divorces will begin to construct a new identity as a single person. A: attachment anxiety B: separation anxiety C: se
A passenger walks toward the rear of a moving train. Describe her motion as seen from a reference point on the train. Then describe it from a reference point on