evaughnruleslh2987 evaughnruleslh2987
  • 16-05-2018
  • Mathematics
contestada

It takes 18 electricians 35 days to wire a new housing subdivision. how many days would 28 electricians require to do the same job?

Respuesta :

calculista
calculista calculista
  • 26-05-2018
let
x----------> number of electricians
y---------> number of days to do the job

we know that
y=k/x
k is the constant of variation
for x=18   y=35 
35=k/18-----> k=630
so
y=630/x
for x=28 
y=630/28----> y=22.5 days

the answer is
22.5 days
Answer Link
leavonhilgers leavonhilgers
  • 28-10-2019

Answer:

22.5

Step-by-step explanation:

Answer Link

Otras preguntas

how many cow and chickens if there are 9 heads and 18 legs
What's per capita mean? (e.g. GDP per capita)
What is the most common form of dna found in organisms?
what is the life cycle of the blue shark
find the slope of a line perpendicular to the line whose equation is 3y + 2x = 6
Explain why diesel engines don't use spark plugs.
Which Parts of the Water Cycle involve absorption of energy from the sun?
to make a lemon-lime drink, Mac mixed 4 liters of lemonade with 2 liters of limeade. How much lemon-lime drink did Mac make? "
A(n) contain many phyla
estimate to draw the 1/4 inch marks on the paper strip. then fill in the blanks belowwhole inch is equal to __________half inches