herbert51 herbert51
  • 18-04-2024
  • Business
contestada

The date a promissory note is to be paid is called the
a. maturity date
Ob. issuance date
O c. demand date
d. discount date

Respuesta :

Otras preguntas

IA triangular parking lot is paved outside a new shopping center. The lengths of the sides of the parking lot are 100 meters, 113 meters, and 86 meters. What is
What does loose ends mean
The economic program of the Soviet Union as displayed in the source was achieved primarily through
If you start with a substance as a solid, what will happen to the molecules as you add thermal energy (heat)? A. molecules slow down due to an increase in kinet
Three point charges, -4.7 x 10-9 C, -9.7 x 10-9 C, and 7.2 x 10-9 C, are fixed at different positions on a circle. The total electric potential at the center o
How are Lourdes and Enrique's departures from Honduras similar? How are they different? And what is your opinion on learning from a parents life experiences, do
What is 652 round of to the 100th
Jessica earn some money for completing chores she spent 1/6 Of it on snack and 1/3 of it on a book she save the rest what fraction of the money did she save.
What is the product of 4/7 and 1/6?
how did David and Solomon strengthen the kingdom of Israel