odonnell90311 odonnell90311
  • 20-01-2023
  • Mathematics
contestada

A contruction manager need 12 worker to complete a building project in 54 day. If the building project need to be completed in 36 day how many more worker doe the contruction manager need to complete the project

Respuesta :

Otras preguntas

(03.02) Thanks Guys! Lee la frase y escribe la forma del verbo en paréntesis. Read the sentence and write the correct form of the verb in parenthesis. Parece
What is the worst thing that can happen to a person who overdoses on a drug?
Which describes the relationship between the Jamestown settlers and the Powhatan in the early 1600s?
The coefficient of 9(14)P is _____. 9 14 126
Hi homines clamaverunt, "Sunt dei! Homines volare non possunt!" Translate from Latin to English
which is a role of carbohydrates?
The freedoms in the First Amendment are collectively known as the freedom of speech. expression. protest. natural right.
The population of frogs at a lake is 22 frogs per square meter. What will be the estimated population of frogs in a habitat of 370 square meters
How many moles are in 68.5 liters of oxygen gas at STP?
What was a key design change for hfc-134a a/c system versus cfc-12 a/c systems?