If the variance of a critical path is 25 days, the standard deviation of that critical path is.

Respuesta :

Otras preguntas

Convert StartFraction 3 pi Over 8 EndFraction radians to degrees
Zapper has beginning equity of $279,000, net income of $62,000, dividends paid of $51,000 and stockholder investments of $17,000. Its ending equity is:
what is the out group of this cladogram​
Environmental engineers minimize the impact of land development on the environment.Please select the best answer from the choices providedt or f​
Help gai I need help its a math
A dog of mass 18 kg runs at a speed of 4 m/s. What is the momentum of the dog? A. 72 kg•m/s B. 36 kg•m/s C. 18 kg•m/s D. 4.5 kg•m/s SUENT
A noisy channel needs to transfer 87 kbps, but has a SNR of 11 dB (decibels). Calculate the minimum Bandwidth required , in kHz, according to Shannon.
Apply the distributive property to factor out the greatest common factor of all three terms. {10a - 25 + 5b} =10a−25+5b =
Solve the Quadratic Equation
3 Easton mixed kg of flour with kg of sugar. 6 Determine a reasonable estimate for the amount of flour and sugar combined. Choose 1 answer: 1 Less than 2 kg B M